Warning: Declaration of action_plugin_clearhistory::register(&$controller) should be compatible with DokuWiki_Action_Plugin::register(Doku_Event_Handler $controller) in /home/ussking2/public_html/KingWiki/lib/plugins/clearhistory/action.php on line 0

Warning: Declaration of action_plugin_tablewidth::register(&$controller) should be compatible with DokuWiki_Action_Plugin::register(Doku_Event_Handler $controller) in /home/ussking2/public_html/KingWiki/lib/plugins/tablewidth/action.php on line 0

Warning: Cannot modify header information - headers already sent by (output started at /home/ussking2/public_html/KingWiki/lib/plugins/clearhistory/action.php:0) in /home/ussking2/public_html/KingWiki/inc/auth.php on line 430

Warning: Cannot modify header information - headers already sent by (output started at /home/ussking2/public_html/KingWiki/lib/plugins/clearhistory/action.php:0) in /home/ussking2/public_html/KingWiki/inc/common.php on line 2045

Warning: Cannot modify header information - headers already sent by (output started at /home/ussking2/public_html/KingWiki/lib/plugins/clearhistory/action.php:0) in /home/ussking2/public_html/KingWiki/inc/actions.php on line 38
1960 - DokuWiki

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
1960 [2009/08/17 16:22]
historian
1960 [2009/08/23 14:17]
historian
Line 1: Line 1:
 ====== Command History for 1960 ====== ====== Command History for 1960 ======
  
-This first Ship's History Report for the USS KING (DLG-10) for the period ending 31 December 1960 is submitted herewith. ​+###This first Ship's History Report for the USS KING (DLG-10) for the period ending 31 December 1960 is submitted herewith. ​
  
 The USS KING was authorized by Congress in the 1956 Shipbuilding Program. Her keel was laid in March 1957 at [[http://​en.wikipedia.org/​wiki/​Puget_Sound_Naval_Shipyard|Puget Sound Naval Shipyard]] Bremerton, Washington. She was launched 6 December 1958, and commissioned on 17 November 1960. The USS KING (DLG-10) is the first ship to be named after [[fadmking|Fleet Admiral Ernest J. KING]]. [[bustard|CDR Melvin E. BUSTARD]] was the first Commanding Officer. ​ The USS KING was authorized by Congress in the 1956 Shipbuilding Program. Her keel was laid in March 1957 at [[http://​en.wikipedia.org/​wiki/​Puget_Sound_Naval_Shipyard|Puget Sound Naval Shipyard]] Bremerton, Washington. She was launched 6 December 1958, and commissioned on 17 November 1960. The USS KING (DLG-10) is the first ship to be named after [[fadmking|Fleet Admiral Ernest J. KING]]. [[bustard|CDR Melvin E. BUSTARD]] was the first Commanding Officer. ​
 +
 +<box 425px round blue center | USS KING (DLG-10) - As Built //(from Gerry Cook, Plankowner)//​ > {{ :​gcookoverall1.jpg?​400x300 }} </​box>​
  
 The KING is approximately 512 feet long and has a beam of 52 feet. Fully loaded she displaces 5600 tons and is capable of speeds in excess of 30 knots. The KING is approximately 512 feet long and has a beam of 52 feet. Fully loaded she displaces 5600 tons and is capable of speeds in excess of 30 knots.
Line 13: Line 15:
 The KING was designed to outfit Fast Task Force as anti-aircraft defense ships with radar picket and anti-submarine capabilities. In order to accomplish this mission, she is provided with the latest in air search and fire control radar and sonar to detect the enemy and the most advanced anti-aircraft and anti-submarine missiles with which to destroy him.  The KING was designed to outfit Fast Task Force as anti-aircraft defense ships with radar picket and anti-submarine capabilities. In order to accomplish this mission, she is provided with the latest in air search and fire control radar and sonar to detect the enemy and the most advanced anti-aircraft and anti-submarine missiles with which to destroy him. 
  
-After commissioning the KING was assigned to the Commandant, [[http://​en.wikipedia.org/​wiki/​Thirteenth_Naval_district|THIRTEENTH Naval District]] for fitting out. While under the control of COMTHIRTEEN KING underwent builder'​s trials at the Puget Sound Naval Shipyard, Bremerton, Washington prior to departing Bremerton for Shakedown Cruise and Underway Training. Scheduled departure date from Puget Sound Naval Shipyard and detachment from COMTHIRTEEN set for 14 January 1960. +After commissioning the KING was assigned to the Commandant, [[http://​en.wikipedia.org/​wiki/​Thirteenth_Naval_district|THIRTEENTH Naval District]] for fitting out. While under the control of COMTHIRTEEN KING underwent builder'​s trials at the Puget Sound Naval Shipyard, Bremerton, Washington prior to departing Bremerton for Shakedown Cruise and Underway Training. Scheduled departure date from Puget Sound Naval Shipyard and detachment from COMTHIRTEEN set for 14 January 1960.###